Risk Management of Cost Overrun: (An Empirical Evaluation of Contributory Variables)

Autori

  • Mac-Barango, D. O. Autore

Abstract

Housing projects are highly susceptible to inherent risk arising due to cost overrun. The research using public sector housing projects in Port Harcourt metropolis, situate in Niger Delta Region of Nigeria, and the statistical tool of regression analyzed the elements of cost overrun that contributed to risk. Research findings established as follows: (i) The parameters of fluctuation costs, variation costs, loss and expense claims, impacted significantly on cost overrun, recording R-Square values of 94%, 97% and 26% respectively. (ii) The combined influence of fluctuation cost, variation cost loss and expense claims also impacted significantly on cost overrun, indicating Rsquare value of almost 100%. The research concludes that cost overrun, necessitated by the tested parameters variables can lead to risk. The research recommends that the appraisals of risk elements necessitated by the observed parameters should be an integral part of risk management programme, which explores the benefits of alternative procurement options, that allocates risk

Downloads

La data di download non è ancora disponibile.

Riferimenti bibliografici

Abban-Amoa, K., & Allotey, S. (2014). Cost overruns in building construction projects: A case study of a government of Ghana project in Accra. Developing Countries Studies, 4(24), 1–12. Retrieved October 4, 2016, from www.iiste.org

Abdul Ganiyu, A. O., Dikko, M. M., & Makinde, J. K. (2011). Risk assignment patterns of small subcontracting firms in the Nigerian construction industry.

Abdulaziz, A., & Michael, J. (1998). Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4).

Abdul-Rahman, H., Wang, C., & Ariffin, H. N. (2015). Identification of risks pertaining to abandoned housing projects in Malaysia. Journal of Construction Engineering. Hindawi Publishing Corporation. Retrieved from www.hindawi.com/journals

Agbo, T. O. (1993). Variations in building contract: The Nigerian perspective. Journal of Nigerian Institute of Quantity Surveyors, 17(1), 28–36.

Agenda 21. (2001). Sustainable construction in developing countries: A discussion document. SIR Pretoria, 15–36.

Aje, I. O., & Omoraka, A. E. (2015). Assessment of factors inhibiting cost performance of construction projects in Nigeria. Journal of the Nigerian Institute of Quantity Surveyors, 60, 1–3.

Akande, C. S. (1986). Contract system in Nigeria: Which way forward? A return to sanity. Journal of the Federation of Building and Civil Engineering Contractors in Nigeria, 3(1), 4–13.

Amandin, M. M., & Kule, J. W. (2016). Project delays on cost overrun risks: A study of Gasabo district construction projects, Kigali, Rwanda. ABC Journal of Advanced Research, 5(1), 1–14. Retrieved from www.publication.org/data/abcjar

Andaewei, M. E., Lamptey-Puddicone, A. D., & Adu, E. T. (2015). Impact of fluctuation risk on risk management of cost overrun: An empirical evaluation of contributory variables. Journal of Environmental Science, Computer Science and Engineering & Technology (JECET), 4(2), 458–463.

Andaewei, M. E. (2003). Criteria for a time-based project central system. Quantity Surveyor: Journal of the NIQS, 42(1), 17–23.

Andaewei, M. E. (2006). Client cost-time fluctuation in a project: Can stochastic PERT predict the unknown? The Quantity Surveyor: Journal of the Nigerian Institute of Quantity Surveyors, 54(2), 11–13.

Andawei, M. E. (2014). Project cost monitoring and control: A cost/time variance & earned value analysis. IOSR Journal of Engineering, 4(2), 58–66.

Ashworth, A., & Hogg, K. (2002). Practice and procedure for the quantity surveyor. Granada: London & New York.

Azhar, N., Farooqui, N. R., & Ahmed, S. M. (2008). Cost overrun factors in construction industry of Pakistan. In First International Conference on Construction in Developing Countries (ICCIDC-1), August 4–5, 2008, Kurachi, Pakistan.

Barrie, D. S., & Paulson, B. C. (1992). Estimating project cost. Professional construction management, including CM, Design-Construct, and General Contracting (3rd ed.). McGraw-Hill.

Bunu, A. (1980). Lower cost housing for the lower income. Paper presented at the Proceedings of the Third International Conference on Housing, Association of Housing Corporation of Nigeria, 317.

Ezeh, E. M. (2012). Managing risk in government procurement: A critical view of the Bureau of Public Procurement. Workshop paper, Achieving enhanced value in construction project delivery. Nigerian Institute of Quantity Surveyors, Lagos, 4–9.

Fisk, E. R. (1982). Construction project administration (2nd ed.). John Wiley & Sons.

Giwa, S. L. (1989). Post contract services in the building industry. The Nigerian Quantity Surveyor: Journal of the Nigerian Institute of Quantity Surveyors, 7(1), 16–25.

Harris, F., & McCaffer, R. (1983). Modern construction management (3rd ed.). Blackwell Scientific Publications.

Ibrahim, D. A., & Kano, H. A. (2004). Cause and impacts of differentials in contract sums of building projects in Nigeria. The Nigerian Quantity Surveyor: Journal of the Nigerian Institute of Quantity Surveyors, 49(8), 16–20.

Jagboro, G. O. (1989). Principles and practice of quantity surveying. Fancy Publications.

James, H. P., et al. (1993). Pricing construction risk: Fuzzy set application. Journal of Construction Engineering and Management, ASCE, 119(14).

Joint Contract Tribunal (JCT). (1977). Standard form of building contract (Private Edition).

Joint Contract Tribunal (JCT). (1980). Standard form of building contract (Private Edition).

Joseph, A. A. (2014). Implications of cost overruns and time delays on major public construction projects. In Proceedings of the 19th International Symposium on the Advancement of Construction Management and Real Estate (pp. xx–xx). Chongqing, China. Retrieved October 4, 2016.

Langdon, D. (2007). Principles of procurement. In Hackett, M., Robinson, I., & Statham (Eds.), The Aqua Group guide to procurement, tendering and contract administration (p. 35). Blackwell Publishing.

Lee, J. K. (2008). Cost overrun and cause in Korean social overhead capital projects: Roads, rails, airports, and ports. Journal of Urban Planning and Development, 134(2), 59–62.

Mac-Barango, D. O. (2003). Bungalow building construction and the environment: Using resource cost profile in solving problems. The Quantity Surveyor: Journal of the Nigerian Institute of Quantity Surveyors, 45(4), 26–30.

Mac-Barango, D. O. (2006). Locational variations in elemental cost of bungalows due to climatic and environmental influences in Nigeria. The Quantity Surveyor: Journal of the Nigerian Institute of Quantity Surveyors, 54(2), 33–39.

Mbachu, J. I. C., & Vinasithamby, R. (2005). Sources of risks in construction project development: An exploratory study. (pp. 1–2).

Mbachu, J. I. C., & Olaoye, G. S. (1999). Analysis of major delay factors in building execution. Nigerian Journal of Construction Technology and Management, 2(1), 81–86.

Memon, A. H., & Rahman, I. A. (2014). Analysis of inhibiting factors of cost performance for large construction projects in Malaysia: Perspective of clients and consultants. The Scientific World Journal, 2014, Article ID 615814.

Murdoch, J., & Hughes, W. (2000). Construction contracts: Law and management (3rd ed.). Spon Press.

Nagarajan, K. (2010). Project management (5th ed.). New Age International Ltd.

Nworah, G. E., & Nwachukwu, G. O. (2004). Risk management approach to claims in construction contract administration. The Quantity Surveyors: Journal of Nigerian Institute of Quantity Surveyors, 46(5), 24–37.

Odediran, S. J., & Windapo, A. O. (2014). A systematic review of factors influencing cost performance of building projects. In Laryea, S., & Ibem, E. (Eds.), Proceedings of the 8th Construction Industry Development Board (CIDB) Post-Graduate Conference (pp. xx–xx). University of Witwatersrand, Johannesburg, South Africa.

Olatunji, A. O. (2008). A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), 60–79.

Onyechi, I. A. (1990). Valuation of price fluctuations on Nigerian building contracts. The Quantity Surveyor: Journal of the Nigerian Institute of Quantity Surveyors, 9(1), 23–28.

Onyeri, F. O. (1989). Variations in contract: A misconstrued concept. The Quantity Surveyor: Journal of Nigerian Institute of Quantity Surveyors, 40.

Pilcher, R. (1992). Principles of construction management (3rd ed.). McGraw-Hill.

Raffat, S. (2004). Sustainable construction in developing countries. In Proceedings of the First Architectural International Conference (p. 6). Cairo University, Egypt.

Ramabodu, M. S., & Verster, J. J. (2010). Factors contributing to cost overruns of construction projects. In Proceedings of the 5th Built Environment Conference (pp. xx–xx). Durban, South Africa.

Ramus, J. W. (1981). Contract practice for quantity surveyors. Heinemann.

Rathi, A. S., & Khandue, P. V. (2016). Study of factors influencing cost overruns: An overview. International Journal of Science and Research (IJSR), 5(3). Retrieved October 5, 2016, from www.ijsr.net

Shittu, J. O. (1996). An appraisal of essence of insurance in building contracts. Journal of Building Science and Management, 11(2), 4.

Siemiatycki, M. (2015). Cost overrun on infrastructure projects: Patterns, causes and cures. Institute of Municipal Finance and Governance (IMFG), Munk School of Global Affairs and University of Toronto. Retrieved from www.munkschool.utoronto.ca/imfg

Smith, P. G., & Merritt, G. M. (2002). Managing consulting project risk (pp. 7–12).

Waziri, S. B. (2012). Modeling the performance of traditional contract projects in Nigeria: An artificial network approach. In Laryea, S., Agyepong, A., Leiringer, R., & Hughes, W. (Eds.), Proceedings of the 4th West Africa Built Environment Research (WABER) Conference (pp. 1383). Abuja, Nigeria.

Willis, A. J., & Willis, C. J. (1980). Practice and procedure for the quantity surveyor (8th ed.). Granada.

Zakariya'u, B. (1991). Insurance in the construction industry. The Nigerian Quantity Surveyor: Journal of the Nigerian Institute of Quantity Surveyors, 13, 22.

Pubblicato

2025-06-29

Come citare

Risk Management of Cost Overrun: (An Empirical Evaluation of Contributory Variables). (2025). Nigerian Journal of Oil and Gas Technology, 2(1), 195-215. https://rsustnjogat.org/ojs/index.php/home/article/view/53